Partnership agreement and subsidy contract
The partnership agreement must be signed by all project partners. After signing the partnership agreement, the managing authority concludes a subsidy contract with the lead partner.
The submission of the partnership agreement and subsidy contract is described in the programme manual, chapter 6.5.
***************
Cost-sharing
During project implementation, partners who plan to use cost-sharing must sign a cost-sharing agreement. Otherwise, the cost-sharing is not eligible. Cost-sharing is described in the programme manual, chapter 7.3.
***************
E-Signature
There are following ways how to sign documents electronically and opening electronically signed documents:
- directly via Latvian eParaksts (eSignature) webpage at https://www.eparaksts.lv/
- by downloading eParaksts software from https://www.eparaksts.lv/lv/palidziba/lejupielades/eparakstitajs-3/
- by downloading Estonian ID-software from https://installer.id.ee/?lang=eng
Last updated: 14.08.2024